Construction Services

6th Day of Construction Gifts: A Cooler that Boasts Serious Ice Retention

Editor’s note: Each day until Christmas, Equipment World is featuring a new gift idea for the construction enthusiast in your life. Check back each day to our Gear section or subscribe to our Equipment World Daily newsletter to see each day’s new idea.

Scorching summer days call for ice cold beverages. Ice cold beverages call for, well, ice. If you’re looking for serious ice retention, Blue Coolers is a great bet. 

This heavy-duty, roto-molded cooler is durable enough for the jobsite and boasts 10 days of ice retention.

The 55-Quart Ice Vault, the company’s most popular model, includes wheels (a must-have for easy transportation), a folding handle, grip handles, non-skid feet, a lockable lid, a freezer-style gasket, a drain plug, tie-down slots and 2 inches of insulation.

For the best possible ice retention Blue Coolers recommends the following:

Pre-chill your cooler: Keep the cooler in a cool place or fill it with a sacrificial bag of ice to lower the internal temperature before adding your food and beverages. Pre-chill your food and beverages: Start with cold or frozen drinks or food to reduce ice loss.Leave no air space: After filling your cooler, top it off with additional ice or fill in any air gaps with newspaper or towels. Air contributes to ice loss. Close and secure the lid with lockdown straps and limit access: Only open the lid when necessary and keep it securely closed as much as possible.Keep out of direct sunlight: Place the cooler in a shady area, or if it must be in direct sunlight, cover it with a tarp or towel. 

Head over to the Blue Coolers website to scoop up this tailgate hero for $279. 

Did you miss our previous article…
https://www.3555pacific.com/?p=828

Construction Services

7th Day of Construction Gifts: Phone Mounts Built for Rugged Environments

Editor’s note: Each day until Christmas, Equipment World is featuring a new gift idea for the construction enthusiast in your life. Check back each day to our Gear section or subscribe to our Equipment World Daily newsletter to see each day’s new idea.

If you’ve ever tried to mount your phone in a cab or in the shop, you know how flimsy most store-bought models really are.

Mob Armor’s MobNetic mounting series features 90-pound pull-force rare-earth magnets for one of the strongest grips this side of the Mississippi.

The mounts are capable of nearly unlimited mounting locations for your smartphone or other handheld devices. It can be tilted 90 degrees, rotated 360 degrees or angled for optimal viewing.


Mob Armor phone mounts are built to withstand rugged environments.Mob ArmorThe magnet will attach to almost any surface made from iron, steel, nickel or several other metals. It also comes with two MobNetic shield plates and two Mob discs for mounting on non-metal dashboards and other surfaces.

“My phone always stays put even when riding through harsh terrain and large bumps. Worth the price – and so far no other magnet mounts that I have tried come close to the strength of these,” says one reviewer.

The MobNetic Maxx (MobNetic Pro) Magnetic Car Mount features solid metal construction and is hand-assembled in the United States. The mount is $49.99 and can be purchased from the Mob Armor website or Amazon. 

Did you miss our previous article…
https://www.3555pacific.com/?p=825

Construction Blogs

Tunnel Machine “Mary” Arrives for Virginia’s Largest Ever Road Project (Video)

“Mary” the tunnel boring machine has arrived for Virginia’s largest ever infrastructure project.

The 9-million-pound TBM will dig two 8,000-foot-long tunnels for the Hampton Roads Bridge Tunnel Expansion Project.

The new tunnels will take more than two years to build and will be about 50 feet deeper than the existing tunnels. The $3.8 billion project will increase tunnel capacity and widen 10 miles of Interstate 64 between the cities of Hampton and Norfolk from four to eight lanes in places, according to the Virginia Department of Transportation.

It is one of the largest infrastructure projects in the country and is expected to be completed in 2025.

The interstate section is one of the state’s most congested, with traffic backing up as much as 6 miles during rush hour, VDOT says.


The Hampton Roads Bridge Tunnel Expansion Project is expected to be completed in 2025.Virginia DOTMary is named after Mary Winston Jackson, an African-American mathematician and aerospace engineer at NASA from Hampton. The TBM was built in Germany and then disassembled to be shipped to Norfolk.

It will take about six months to reassemble the 170-piece TBM in a 65-foot-deep launching pit on South Island. When reassembled it will be 46 feet tall and more than 430 feet long. It will tunnel at 50 feet per day, not only digging but installing concrete panels along the way.

The TBM will start on the South Island and tunnel to the North Island. That should take about a year. Then the machine will be turned around, a four-month process, and dig back to the South Island for another year of tunneling.

The project is expected to create 28,000 jobs and generate $4.6 billion in economic impact, according to VDOT.

Check out this concept video of what the future HRBT will look like when completed:

CMSBrowserComponents.load({ el: ‘#vue-1639674602881-543’, name: ‘OEmbed’, props: {“mountPoint”:”/__oembed”,”url”:”https://youtu.be/x4rNYsSJxhM”,”attrs”:{“type”:”oembed”,”id”:”https://youtu.be/x4rNYsSJxhM”,”element”:”aside”}}, hydrate: false });

And here’s one that shows a time-lapse of Mary’s construction in Germany:

CMSBrowserComponents.load({ el: ‘#vue-1639674602881-422’, name: ‘OEmbed’, props: {“mountPoint”:”/__oembed”,”url”:”https://youtu.be/iKVF1JfvW68″,”attrs”:{“type”:”oembed”,”id”:”https://youtu.be/iKVF1JfvW68″,”element”:”aside”}}, hydrate: false });

Mary was built by Herrenknecht at a cost of $101 million, which included shipping.

Here’s a video that demonstrates the tunneling process, provided by the Chesapeake Bay Bridge Tunnel District and Dragados/Chesapeake Tunnel Joint Venture:

CMSBrowserComponents.load({ el: ‘#vue-1639674602881-422’, name: ‘OEmbed’, props: {“mountPoint”:”/__oembed”,”url”:”https://youtu.be/iKVF1JfvW68″,”attrs”:{“type”:”oembed”,”id”:”https://youtu.be/iKVF1JfvW68″,”element”:”aside”}}, hydrate: false });

The contractor on the HRBT Expansion is a joint venture with Dragados USA serving as the lead contractor and HDR and Mott MacDonald as lead designers. Other team members: Flatiron Constructors, Vinci Construction, and Dodin Campenon Bernard.

south island construction for Mary tunnel machine
The South Island of the Hampton Roads Bridge Tunnel is being prepared for tunnel boring machine Mary’s reassembly in a 65-foot-deep launching pit.Virginia DOT

Construction Management

8th Day of Construction Gifts: Realistic Equipment Toys from Bruder

Editor’s note: From now until Christmas, Equipment World is featuring a new gift idea each day for the construction enthusiast in your life. Check back daily to our Gear section or subscribe to our Equipment World Daily newsletter to see each day’s new idea.

If your kids keep trying to swipe your collection of diecast model equipment, get them these realistic construction toys from Bruder instead. 

These impressive toy models are made to look as close as possible to the real equipment, and Bruder says they can stand up to the toughest sandbox conditions. The models feature functioning parts, like individually linked tracks, for an authentic look and sound. Accessories and spare parts can be purchased separately.

Featured brands include Caterpillar, JCB, JLG, Liebherr, Mack, Manitou and Volvo.

Prices range from $15 to over $100 depending on the size and complexity of the equipment. You can view and purchase the toy models on Bruder’s website.

Once you see this video, you’re going to want these toys too. 

Did you miss our previous article…
https://www.3555pacific.com/?p=818